PPM for Tuesday 27 May
Key info
Public Performance Measure (PPM) is the older measure of train operator performance. PPM is based only on delay at destination and the train must have called at all planned stops.
Source: Network Rail
Data quality: Low – Data source does not adjust for calling pattern changes and some smaller methodology differences
Last updated: 27 May 2025 at 18:18
National summary
Within PPM: 12542 (86%)
Late: 1137 (8%)
Very late or cancelled: 740 (5%)
Total: 14419
Train Operating Company (TOC) summary
Operator name | Within PPM | Late | Very late or cancelled |
---|---|---|---|
Greater Anglia | 852 (98%) | 9 (1%) | 4 (0%) |
Chiltern | 232 (98%) | 3 (1%) | 0 (0%) |
c2c | 246 (96%) | 7 (3%) | 1 (0%) |
ScotRail | 1481 (94%) | 70 (4%) | 11 (1%) |
Avanti West Coast | 107 (93%) | 5 (4%) | 3 (3%) |
West Midlands Trains | 766 (91%) | 65 (8%) | 10 (1%) |
Merseyrail | 404 (91%) | 21 (5%) | 16 (4%) |
East Midlands Railway | 298 (90%) | 33 (10%) | 0 (0%) |
Northern Trains | 1610 (90%) | 143 (8%) | 33 (2%) |
London North Eastern Railway | 104 (89%) | 11 (9%) | 1 (1%) |
Southeastern | 1036 (88%) | 109 (9%) | 26 (2%) |
TransPennine Trains | 183 (87%) | 7 (3%) | 18 (9%) |
London Overground | 903 (85%) | 38 (4%) | 117 (11%) |
Great Western Railway | 982 (84%) | 108 (9%) | 68 (6%) |
Transport for Wales | 577 (82%) | 58 (8%) | 68 (10%) |
Elizabeth line | 389 (82%) | 29 (6%) | 54 (11%) |
CrossCountry | 140 (80%) | 14 (8%) | 19 (11%) |
Govia Thameslink Railway | 1444 (77%) | 267 (14%) | 152 (8%) |
South Western Railway | 788 (73%) | 140 (13%) | 139 (13%) |
Open Access Operator summary
Operator name | Within PPM | Late | Very late or cancelled |
---|---|---|---|
Hull Trains | 9 (100%) | 0 (0%) | 0 (0%) |
Lumo | 5 (83%) | 1 (17%) | 0 (0%) |
Grand Central | 11 (78%) | 3 (21%) | 0 (0%) |
Heathrow Express | 83 (77%) | 12 (11%) | 12 (11%) |